Dashboard
🏢
Projects
24
8 active this month
⚙️
Activities
156
32 in progress
📋
Checklists
89
12 pending review
🔴
Open Defects
17
3 critical
👥
Users
42
Active accounts
Recent Checklist Activity
Foundation Check #CH-089 submitted for review
Today, 10:32 AM · Project: Tower Block A
Pending
Electrical Inspection #CH-088 approved
Yesterday, 4:15 PM · Project: Mall Complex
Approved
Defect #DF-017 raised on Roofing Activity
Yesterday, 2:00 PM · Project: Villa Phase 2
Defect
Plumbing Check #CH-087 created
2 days ago · Project: Tower Block A
Draft
Safety Audit #CH-086 completed
3 days ago · Project: Bridge Work
Closed
Project Progress
Tower Block A 72%
Mall Complex 45%
Villa Phase 2 88%
Bridge Work 31%
Highway Expansion 60%
Defect Summary
17
OPEN
9
IN PROGRESS
63
CLOSED
Projects
Manage all construction and inspection projects

Tower Block A

Commercial high-rise — 32 floors · Ref: Type A

72% Active

Mall Complex

Retail & entertainment complex · Ref: Type B

45% In Progress

Villa Phase 2

Residential villa cluster · Ref: Type A

88% Near Completion

Bridge Work

Infrastructure bridge — River crossing · Ref: Type C

31% Planning
Activities
Define work activities and assign to projects
Activity List
# Title Type Parent Status Actions
ACT-001
Foundation Inspection
Concrete pour verification
Civil Structural Work Enabled
ACT-002
Electrical Wiring Check
Panel & circuit inspection
Electrical MEP Works Enabled
ACT-003
Plumbing Pressure Test
Water line integrity check
Mechanical MEP Works Disabled
ACT-004
Roofing Quality Check
Waterproofing & insulation
Civil Finishing Works Enabled
Activity Types
Categories to classify all project activities
#TitleDescriptionStatusActions
1
Civil
Structural and civil construction activitiesEnabled
2
Electrical
Electrical systems and panel installationsEnabled
3
Mechanical
Plumbing, HVAC, and mechanical systemsEnabled
4
Safety
Safety audits and compliance checksDisabled
Project References
Lookup values used to classify projects
#TitleDescriptionActions
1
Type A — Residential
Residential housing and apartment projects
2
Type B — Commercial
Commercial buildings, malls, offices
3
Type C — Infrastructure
Roads, bridges and public infrastructure
Checklists
Inspection checklists linked to projects & activities
IDProjectActivityDateCreated ByChecked ByStatusActions
CH-089
Tower Block A
Foundation Inspection 25 May 2026 Rahul S. Pending
CH-088
Mall Complex
Electrical Check 24 May 2026 Priya M. Vikram K. Approved
CH-087
Villa Phase 2
Roofing Check 23 May 2026 Anand T. Vikram K. Rejected
CH-086
Bridge Work
Safety Audit 22 May 2026 Rahul S. Vikram K. Approved
Checklist Questions
Questions and checkpoints used in inspection checklists
1
Is all personal protective equipment (PPE) worn correctly?
Verify that workers are wearing helmets, gloves, reflective vests, and safety boots as required.
✓ Yes ✗ No — N/A
Safety
2
Is the concrete mix meeting specified grade requirements?
Check slump test results and mix design compliance with structural drawings.
Pass Fail Partial
Quality
3
Are fire safety extinguishers placed as per site layout plan?
Confirm extinguisher positions match emergency plan and are accessible.
✓ Yes ✗ No — N/A
Compliance
4
Is the formwork properly aligned and braced?
Check alignment tolerances and bracing against shuttering specification.
Pass Fail
Disabled
Checklist Categories
Hierarchical categories for organising questions
#TitleParentDescriptionActions
1
Safety
RootAll safety-related inspection points
2
PPE Checks
SafetyPersonal protective equipment verification
3
Fire Safety
SafetyFire extinguisher and evacuation checks
4
Quality
RootMaterial & workmanship quality checks
5
Compliance
RootRegulatory and code compliance checks
Defects
Track and resolve inspection defects with full history
All (17)
Open (10)
In Progress (4)
Closed (3)
DF-017 · Question: PPE Check
Workers on Level 3 not wearing safety helmets
Observed 4 workers on Level 3 formwork without approved hard hats during afternoon shift.
DF-016 · Question: Concrete Grade
Concrete slump test failed for Column C-12
Mix ratio deviation observed; slump test result 140mm vs specified 100mm max. Needs re-test after correction.
DF-015 · Question: Fire Safety
Fire extinguisher missing from Zone B storage area
One extinguisher found missing from designated position in Zone B. Replacement installed on 20 May 2026.
18 May 2026
Defect Raised
Missing extinguisher reported by site inspector
19 May 2026
Assigned to Store Manager
Procurement initiated
20 May 2026
Closed
Replacement installed and verified
Users
Manage platform users and their access
#NameContactUser TypeStatusActions
U-001
RS
Rahul Sharma
rahul.sharma@daipl.com
+91 98765 43210 Inspector Active
U-002
PM
Priya Mehta
priya.mehta@daipl.com
+91 87654 32109 Supervisor Active
U-003
VK
Vikram Kumar
vikram.k@daipl.com
+91 76543 21098 Admin Active
U-004
AT
Anand Tiwari
anand.t@daipl.com
+91 65432 10987 Viewer Disabled
User Types
Define roles and permission groups
#RoleDescriptionUsersStatusActions
1
Admin
Full system access and configuration rights2Enabled
2
Inspector
Can create and submit checklists, raise defects18Enabled
3
Supervisor
Can approve checklists and assign defects8Enabled
4
Viewer
Read-only access to reports and checklists14Disabled
Reporting Structure
Define who reports to whom in the organisation
Hierarchy View
Vikram Kumar
Admin
Priya Mehta
Supervisor
Rahul Sharma
Inspector
Anand Tiwari
Inspector
Reporting Table
#UserReports ToActions
1
Rahul Sharma
Inspector
Priya Mehta
2
Anand Tiwari
Inspector
Vikram Kumar
3
Priya Mehta
Supervisor
Vikram Kumar